| 005 |
Regulation of the Shenzhen River, Stage II, Phase I Works Monitoring Off-site Compensation Works - Mai Po : Final Report. 1999 |
| 009 |
An Extension to the Existing Boardwalk and New Floating Mudflat Bird-watching Hide at Mai Po Nature Reserve for Education and Conservation Purposes : Project Profile. 2006 |
| 010 |
Trial on Improvements to the High Tide Roosting Habitat for Migratory Waterbirds at Gei wai #16/17 Mai Po Nature Reserve 2005-06. Waterbird Report |
| 011 |
Trial on Improvements to the High-tide Roosting Habitat for Migratory Waterbirds at Gei wai #16/17 Mai Po Nature Reserve 2005-06 : Final Report |
| 012 |
Trials to Improve the Roosting Habitat for Wintering Waterfowl in Ponds #20 and #24 at Mai Po Nature Reserve 2005-06 : Waterfowl Report |
| 013 |
Trials to Improve the Roosting Habitat for Wintering Waterfowl in Ponds #20 and #24 at Mai Po Nature Reserve 2005-06 : Final Report |
| 014 |
Research & Monitoring Programme Plan for Mai Po Nature Reserve 2007-2011 |
| 015 |
Study upon the Wildlife Impact and Potential Economic Habitat Management Benefits of Introducing Asian Water Buffalo Bubalus bubalis into the Freshwater Ponds at Mai Po Nature Reserve - Final Project Report 2008 |